עדיין מחפשים עבודה במנועי חיפוש? הגיע הזמן להשתדרג!
במקום לעבור לבד על אלפי מודעות, Jobify מנתחת את קורות החיים שלך ומציגה לך רק משרות שבאמת מתאימות לך.
מעל 80,000 משרות • 4,000 חדשות ביום
חינם. בלי פרסומות. בלי אותיות קטנות.
Overhead Catenary System (OCS) Construction Foreman/Team Leader.
In charge of:
- Application of the method statements
- Repartition of the charge into its team.
- Capture of the data to fill the Quality controls reports
- Health, Safety & Environment (HSE) compliance
Organisation structure (job belongs to...)
Project Organization
Reports directly to:
OCS Supervisor
Other reporting to:
Functionally linked to Site/Country/Cluster/Region Field Ops structure
Direct reports
Leading the OCS construction workers
Network & Links
Internal
- Quality / EHS / Project Site Coordination (OPC) supervisors
- Warehouse Leader
- Other OCS Team Leaders / Foremen
- Suppliers and/or sub-contractors
- Customers
Key accountabilities
Management of its team to enable the delivery, erection, installation works achievement in the optimal conditions: performances, costs, quality and health and safety.
- The OCS Construction Foreman/Team Leader reports directly to the OCS Supervisor Manager and is in charge of making sure that the catenary is installed in conformity with the Basic and Detail Designs, the installation procedures, the Quality Assurance / Quality Control (QA/QC) system, the Time Schedule in place and the work permit process.
- The OCS Construction Foreman/Team Leader is in charge of the work permit procedures (Lock-out/Tag-out/Track access/etc.) for its team if applicable.
- Its duties include also the necessity to report on all technical aspects with its construction manager about Detail Design and Non-Conformities Reports (NCR) on equipment/materials.
- During the installation, the Construction Foreman/Team Leader is required to organize the tasks, in a competent and consistent way, so that all key activities are properly done and controlled.
- Its duties include the follow up of the service of the machine and maintain the highest level of availability.
- The OCS Construction Foreman/Team Leader alerts and reports to the management on any concerns he has related to the job he has to perform, and especially regarding: HSE, Quality, Access, Customer / Consultant requirements, etc.
- The OCS Construction Foreman/Team Leader is responsible for the onsite Quality Plan & HSE Plan implementation
- Daily report of his construction team.
- Daily Quality controls reports
- Daily Report of the equipment or material consumption.
- Report of the service of plants, machines and tools
Performance measurements
- HSE compliance
- Quality compliance regarding the drawing and Work Method Statements
- Low level of absenteeism
In charge of:
- Application of the method statements
- Repartition of the charge into its team.
- Capture of the data to fill the Quality controls reports
- Health, Safety & Environment (HSE) compliance
Organisation structure (job belongs to...)
Project Organization
Reports directly to:
OCS Supervisor
Other reporting to:
Functionally linked to Site/Country/Cluster/Region Field Ops structure
Direct reports
Leading the OCS construction workers
Network & Links
Internal
- Quality / EHS / Project Site Coordination (OPC) supervisors
- Warehouse Leader
- Other OCS Team Leaders / Foremen
- Suppliers and/or sub-contractors
- Customers
Management of its team to enable the delivery, erection, installation works achievement in the optimal conditions: performances, costs, quality and health and safety.
- The OCS Construction Foreman/Team Leader reports directly to the OCS Supervisor Manager and is in charge of making sure that the catenary is installed in conformity with the Basic and Detail Designs, the installation procedures, the Quality Assurance / Quality Control (QA/QC) system, the Time Schedule in place and the work permit process.
- The OCS Construction Foreman/Team Leader is in charge of the work permit procedures (Lock-out/Tag-out/Track access/etc.) for its team if applicable.
- Its duties include also the necessity to report on all technical aspects with its construction manager about Detail Design and Non-Conformities Reports (NCR) on equipment/materials.
- During the installation, the Construction Foreman/Team Leader is required to organize the tasks, in a competent and consistent way, so that all key activities are properly done and controlled.
- Its duties include the follow up of the service of the machine and maintain the highest level of availability.
- The OCS Construction Foreman/Team Leader alerts and reports to the management on any concerns he has related to the job he has to perform, and especially regarding: HSE, Quality, Access, Customer / Consultant requirements, etc.
- The OCS Construction Foreman/Team Leader is responsible for the onsite Quality Plan & HSE Plan implementation
- Daily report of his construction team.
- Daily Quality controls reports
- Daily Report of the equipment or material consumption.
- Report of the service of plants, machines and tools
Performance measurements
- HSE compliance
- Quality compliance regarding the drawing and Work Method Statements
- Low level of absenteeism
במקום לעבור לבד על אלפי מודעות, Jobify מנתחת את קורות החיים שלך ומציגה לך רק משרות שבאמת מתאימות לך.
מעל 80,000 משרות • 4,000 חדשות ביום
חינם. בלי פרסומות. בלי אותיות קטנות.
שאלות ותשובות עבור משרת OHLE Construction Foreman / Team Leader
מנהל עבודה/ראש צוות בנייה של OHLE בחברת Alstom אחראי על ניהול צוותי התקנה, הבטחת עמידה בתכנון, נהלי התקנה, מערכת QA/QC ולוחות זמנים. התפקיד כולל גם דיווח על היבטים טכניים, ארגון משימות, מעקב אחר שירות מכונות, ויישום תוכניות איכות ובטיחות באתר.
משרות נוספות מומלצות עבורך
-
דרוש /ה מנהל /ת עבודה שלד לדימונה
-
דימונה
SVT
-
-
HIRING FOR ISRAEL
-
תל אביב - יפו
Career's World Travel & Trade links, Cochin
-
-
Certified Construction Foreman
-
ירושלים
Shoham Engineering and Development Ltd
-
-
לחברה קבלנית מובילה בענף דרוש /ה מנהל /ת עבודה מנוסה בשלד- פרויקט חדש ויוקרתי בירושלים!
-
מודיעין-מכבים-רעות
ש.מ.ש. השמות ופרוייקטים
-
-
מנהל/ת עבודה שלד לפרויקט ציבורי - דרום
-
שדרות
INSITE-HR
-
-
דרוש/ה מנהל/ת עבודה שלד לפרויקט מגורים בתל אביב
-
הרצליה
סולל בונה- שיכון ובינוי
-
12,000-17,000 ₪