עדיין מחפשים עבודה במנועי חיפוש? הגיע הזמן להשתדרג!
במקום לחפש לבד בין מאות מודעות – תנו ל-Jobify לנתח את קורות החיים שלכם ולהציג לכם רק הזדמנויות שבאמת שוות את הזמן שלכם מתוך מאגר המשרות הגדול בישראל.
השימוש חינם, ללא עלות וללא הגבלה.
Organisation: NTA Metropolitan Mass Transit System
Location: Israel
Dear Prospective Participant,
Introduction And Overview
NTA - Metropolitan Mass Transit System Ltd. (“NTA”) is an Israeli government owned company tasked with the development of the mass transit system in the Tel Aviv metropolitan area, which includes, inter alia, a metro network (the “Metro Network Programme”).
NTA intends, in the near future, to initiate a pre-qualification process for the design and execution of certain works packages as part of the Tel Aviv Metropolitan Metro Network Programme.
In general terms, the Metro Network Programme will comprise three (3) mostly underground metro lines of approximately one hundred and fifty (150) kilometers in length, one hundred and nine (109) stations, hundreds of units of rolling stock and seven (7) Transportation Hubs, extending the Tel Aviv metropolitan transportation network to Tel Aviv’s more remote suburbs.
According to the Metro Network Programme’s procurement strategy, it will be undertaken by way of three (3) main design and execution packages – Advanced Works, Infra #1 Works and Infra #2 Works. The pre-qualification process to be initiated is expected to relate to the Infra #1 Works packages of Execution Stage 1, which will include the design and construction of tunnels and underground stations.
The Pre-Qualification Process
The Pre-qualification Process Is Intended For Experienced And Capable Entities With Expertise In One Or More Of The Following Key Areas
- Tunneling Works: Experience in the construction of TBM tunnels in urban environments.
- Cut & Cover Underground Structures: Experience in the design and construction of largescale underground structures using the “cut & cover” method.
- Mined Underground Structures: Experience in the design and construction of largescale underground structures using traditional sequential excavation methods (e.g., NATM).
In addition, “financial robustness” requirements will be verified as part of the process.
Participants that demonstrate compliance with the pre-qualification requirements will be invited to participate in future tender processes, for the execution of multiple works packages, each of which will include design and construction of tunnels and underground stations for the vast majority of the sections of the Metro Network Programme.
Flexibility in the Organization of the Participants
Both Single Entities And Joint Ventures Are Welcome To Participate, As The Pre-qualification Process Will Allow For a Variety Of Compositions Such As
- Single Entity Participants: Individual companies or organizations that independently meet all professional and financial requirements.
- Joint Venture Participants: Associations of entities, each of which complies with an applicable professional requirement, which will be permitted to commit their combined strengths and contributions so as to meet all requirements collectively.
- Experience Providers: Entities may also participate in the process as subcontractors of the participants.
The pre-qualification documents will, however, include certain requirements and parameters with respect to the members and composition of the bidders, such as maximum number of members, minimum registration and/or certification of members, etc.
We encourage you to review the full invitation for pre-qualification, which will be published on NTA’s official website in due course under the “Tenders” tab, and consider this unique opportunity to contribute to a landmark project in the heart of Israel’s largest metropolitan area.
The foregoing is only preliminary and merely reflects NTA’s current expectations for this project. Accordingly, the foregoing does not constitute, nor should it be relied upon as, a substitute for a comprehensive analysis and evaluation of matters affecting the participation in the Metro Network Programme, or a substitute for a comprehensive analysis of all applicable tender documents, including (inter alia) all applicable pre-qualification documents.
We look forward to your participation.
Sincerely,
NTA – Metropolitan Mass Transit Systems Ltd.
במקום לחפש לבד בין מאות מודעות – תנו ל-Jobify לנתח את קורות החיים שלכם ולהציג לכם רק הזדמנויות שבאמת שוות את הזמן שלכם מתוך מאגר המשרות הגדול בישראל.
השימוש חינם, ללא עלות וללא הגבלה.
שאלות ותשובות עבור משרת Information about a Pre-Qualification Process for the Tel Aviv Metropolitan Metro Network Programme; Infra #1 Works
תהליך המיון המוקדם (Pre-Qualification) מיועד לגופים מנוסים ובעלי יכולות עם מומחיות בתחומי עבודות מנהור, מבנים תת-קרקעיים בשיטת חפירה וכיסוי, ומבנים תת-קרקעיים בשיטת כרייה. המשתתפים שיעמדו בדרישות יוזמנו להשתתף במכרזים עתידיים לביצוע חבילות עבודה הכוללות תכנון ובניית מנהרות ותחנות תת-קרקעיות.
משרות נוספות מומלצות עבורך
-
לקבוצת גליל דרוש /ה מנהל /ת פרויקטים הנדסה אזרחית
-
דימונה
גליל הנדסה
-
-
מנהל פרויקטים לניהול ביצוע לסניף אילת
-
חיפה
קבוצת גדיש הנדסה וניהול
-
-
לקבוצת גליל דרוש/ה מנהל/ת פרויקטים הנדסה אזרחית
-
באר שבע
קבוצת גליל הנדסה
-
-
לסולל בונה מקבוצת שיכון ובינוי, דרוש /ה מנהל /ת פרויקט למרכז
-
אור יהודה
סולל בונה- שיכון ובינוי
-
-
מנהל.ת פרויקט הנדסה אזרחית
-
ערד
קבוצת ברן בע"מ
-
-
דרוש/ה מנהל/ת פרויקטים אזרחי/ת באזור הדרום!
-
דימונה
AM Projects
-