עדיין מחפשים עבודה במנועי חיפוש? הגיע הזמן להשתדרג!
במקום לעבור לבד על אלפי מודעות, Jobify מנתחת את קורות החיים שלך ומציגה לך רק משרות שבאמת מתאימות לך.
מעל 80,000 משרות • 4,000 חדשות ביום
חינם. בלי פרסומות. בלי אותיות קטנות.
Overhead Catenary System (OCS) Construction Foreman/Team Leader.
In charge of:
Application of the method statements
Repartition of the charge into its team.
Capture of the data to fill the Quality controls reports
Health, Safety & Environment (HSE) compliance
ORGANISATION
Organisation structure (job belongs to...)
Project Organization
Reports directly to:
OCS Supervisor
Other reporting to:
Functionally linked to Site/Country/Cluster/Region Field Ops structure
Direct reports
Leading the OCS construction workers
Network & Links
Internal
Quality / EHS / Project Site Coordination (OPC) supervisors
Warehouse Leader
Other OCS Team Leaders / Foremen
External
Suppliers and/or sub-contractors
Customers
MAIN RESPONSABILITIES
Key accountabilities
Management of its team to enable the delivery, erection, installation works achievement in the optimal conditions: performances, costs, quality and health and safety.
The OCS Construction Foreman/Team Leader reports directly to the OCS Supervisor Manager and is in charge of making sure that the catenary is installed in conformity with the Basic and Detail Designs, the installation procedures, the Quality Assurance / Quality Control (QA/QC) system, the Time Schedule in place and the work permit process.
The OCS Construction Foreman/Team Leader is in charge of the work permit procedures (Lock-out/Tag-out/Track access/etc.) for its team if applicable.
Its duties include also the necessity to report on all technical aspects with its construction manager about Detail Design and Non-Conformities Reports (NCR) on equipment/materials.
During the installation, the Construction Foreman/Team Leader is required to organize the tasks, in a competent and consistent way, so that all key activities are properly done and controlled.
Its duties include the follow up of the service of the machine and maintain the highest level of availability.
The OCS Construction Foreman/Team Leader alerts and reports to the management on any concerns he has related to the job he has to perform, and especially regarding: HSE, Quality, Access, Customer / Consultant requirements, etc.
The OCS Construction Foreman/Team Leader is responsible for the onsite Quality Plan & HSE Plan implementation
Delivery
Daily report of his construction team.
Daily Quality controls reports
Daily Report of the equipment or material consumption.
Report of the service of plants, machines and tools
The OCS Construction Foreman/Team Leader must be based on-shore, on site, typically in the Project Leading Unit.
Performance measurements
HSE compliance
Quality compliance regarding the drawing and Work Method Statements
Low level of absenteeism
Overhead Catenary System (OCS) Construction Foreman/Team Leader.
In charge of:
Application of the method statements
Repartition of the charge into its team.
Capture of the data to fill the Quality controls reports
Health, Safety & Environment (HSE) compliance
ORGANISATION
Organisation structure (job belongs to...)
Project Organization
Reports directly to:
OCS Supervisor
Other reporting to:
Functionally linked to Site/Country/Cluster/Region Field Ops structure
Direct reports
Leading the OCS construction workers
Network & Links
Internal
Quality / EHS / Project Site Coordination (OPC) supervisors
Warehouse Leader
Other OCS Team Leaders / Foremen
External
Suppliers and/or sub-contractors
Customers
MAIN RESPONSABILITIES
Key accountabilities
Management of its team to enable the delivery, erection, installation works achievement in the optimal conditions: performances, costs, quality and health and safety.
The OCS Construction Foreman/Team Leader reports directly to the OCS Supervisor Manager and is in charge of making sure that the catenary is installed in conformity with the Basic and Detail Designs, the installation procedures, the Quality Assurance / Quality Control (QA/QC) system, the Time Schedule in place and the work permit process.
The OCS Construction Foreman/Team Leader is in charge of the work permit procedures (Lock-out/Tag-out/Track access/etc.) for its team if applicable.
Its duties include also the necessity to report on all technical aspects with its construction manager about Detail Design and Non-Conformities Reports (NCR) on equipment/materials.
During the installation, the Construction Foreman/Team Leader is required to organize the tasks, in a competent and consistent way, so that all key activities are properly done and controlled.
Its duties include the follow up of the service of the machine and maintain the highest level of availability.
The OCS Construction Foreman/Team Leader alerts and reports to the management on any concerns he has related to the job he has to perform, and especially regarding: HSE, Quality, Access, Customer / Consultant requirements, etc.
The OCS Construction Foreman/Team Leader is responsible for the onsite Quality Plan & HSE Plan implementation
Delivery
Daily report of his construction team.
Daily Quality controls reports
Daily Report of the equipment or material consumption.
Report of the service of plants, machines and tools
The OCS Construction Foreman/Team Leader must be based on-shore, on site, typically in the Project Leading Unit.
Performance measurements
HSE compliance
Quality compliance regarding the drawing and Work Method Statements
Low level of absenteeism
Overhead Catenary System (OCS) Construction Foreman/Team Leader.
In charge of:
Application of the method statements
Repartition of the charge into its team.
Capture of the data to fill the Quality controls reports
Health, Safety & Environment (HSE) compliance
ORGANISATION
Organisation structure (job belongs to...)
Project Organization
Reports directly to:
OCS Supervisor
Other reporting to:
Functionally linked to Site/Country/Cluster/Region Field Ops structure
Direct reports
Leading the OCS construction workers
Network & Links
Internal
Quality / EHS / Project Site Coordination (OPC) supervisors
Warehouse Leader
Other OCS Team Leaders / Foremen
External
Suppliers and/or sub-contractors
Customers
MAIN RESPONSABILITIES
Key accountabilities
Management of its team to enable the delivery, erection, installation works achievement in the optimal conditions: performances, costs, quality and health and safety.
The OCS Construction Foreman/Team Leader reports directly to the OCS Supervisor Manager and is in charge of making sure that the catenary is installed in conformity with the Basic and Detail Designs, the installation procedures, the Quality Assurance / Quality Control (QA/QC) system, the Time Schedule in place and the work permit process.
The OCS Construction Foreman/Team Leader is in charge of the work permit procedures (Lock-out/Tag-out/Track access/etc.) for its team if applicable.
Its duties include also the necessity to report on all technical aspects with its construction manager about Detail Design and Non-Conformities Reports (NCR) on equipment/materials.
During the installation, the Construction Foreman/Team Leader is required to organize the tasks, in a competent and consistent way, so that all key activities are properly done and controlled.
Its duties include the follow up of the service of the machine and maintain the highest level of availability.
The OCS Construction Foreman/Team Leader alerts and reports to the management on any concerns he has related to the job he has to perform, and especially regarding: HSE, Quality, Access, Customer / Consultant requirements, etc.
The OCS Construction Foreman/Team Leader is responsible for the onsite Quality Plan & HSE Plan implementation
Delivery
Daily report of his construction team.
Daily Quality controls reports
Daily Report of the equipment or material consumption.
Report of the service of plants, machines and tools
The OCS Construction Foreman/Team Leader must be based on-shore, on site, typically in the Project Leading Unit.
Performance measurements
HSE compliance
Quality compliance regarding the drawing and Work Method Statements
Low level of absenteeism
Job Segment: Quality Assurance, Manager, Technology, Management
במקום לעבור לבד על אלפי מודעות, Jobify מנתחת את קורות החיים שלך ומציגה לך רק משרות שבאמת מתאימות לך.
מעל 80,000 משרות • 4,000 חדשות ביום
חינם. בלי פרסומות. בלי אותיות קטנות.
שאלות ותשובות עבור משרת OHLE Construction Foreman / Team Leader
מנהל עבודה/ראש צוות OHLE Construction בחברת ALSTOM אחראי על ניהול צוותי התקנה, הבטחת עמידה בתקני איכות ובטיחות, יישום נהלי עבודה, ודיווח שוטף על התקדמות הפרויקט. התפקיד כולל גם אחריות על עמידה בלוחות זמנים וניהול היתרי עבודה באתר.
משרות נוספות מומלצות עבורך
-
OHLE Construction Foreman / Team Leader
-
תל אביב - יפו
Alstom
-
-
Certified Construction Foreman
-
ירושלים
Shoham Engineering and Development Ltd
-
-
לחברה קבלנית מובילה בענף דרוש /ה מנהל /ת עבודה מנוסה בשלד- פרויקט חדש ויוקרתי בירושלים!
-
מודיעין-מכבים-רעות
ש.מ.ש. השמות ופרוייקטים
-
-
דרוש/ה מנהל/ת עבודה שלד לפרויקט מגורים בתל אביב
-
הרצליה
סולל בונה- שיכון ובינוי
-
-
לקבוצת תדהר דרוש /ה מנהל /ת עבודה שלד לפרויקט החברה במרכז
-
רמת השרון
תדהר
-